London Underground Power Upgrade Package 10
22kV cable route design to power a section of Crossrail.
Date: 2014 to 2016
Client: J. Murphy & Sons
Project Type: Design
About this Project
The detailed design of approximately 10km of cable route including 22kV feeders and associated fibre route. We provided design of a cable route management system, structure gauging for a cable bridge over a Road-Rail-Vehicle Access Point, Under Track Crossings (UTXs) and several Over Track Crossings (OTXs).