GRIP 1-2 Feasibility Studies
- Date: 2008
- Client: Network Rail
About this Project
We produced technical and cost feasibility reports for increasing platform capacity across the southern and south-east regions to facilitate the upgrade to 12-car trains. Our design scope included layout drawings, cost-schedules and outline designs for platform lengthening as well as designs for new car parking along with associated flood risk assessments.
![network](https://wcs-consult.co.uk/wp-content/webpc-passthru.php?src=http://wcs-consult.co.uk/wp-content/uploads/network.jpg&nocache=1)