GRIP 1-2 Feasibility Studies

  • Date: 2008
  • Client: Network Rail

About this Project

We produced technical and cost feasibility reports for increasing platform capacity across the southern and south-east regions to facilitate the upgrade to 12-car trains. Our design scope included layout drawings, cost-schedules and outline designs for platform lengthening as well as designs for new car parking along with associated flood risk  assessments.