PROJECT
Lineside Switching Platforms
ABOUT THIS PROJECT
WCS have carried out the survey and design of 70 lineside switching platforms across the Greater West programme of works between Maidenhead and Royal Wootton Bassett. These design have been carried out on Projectwise using BIM level 2.
Date: 2018 – 2019
Client: UK Power Networks Services