LUL Power Upgrade Package 4

  • Date: 2009 – 2013

  • Client: ABB/TfL

About this Project

A New Bulk Supply Point and associated 52km of HV cable route for the LU power upgrade. WCS provided the key management and design interface on behalf of the electrical contractor ABB for their civil engineering design & build contractor on this turnkey contract.