Ilkeston 33kV Substation
WCS are providing a fully comprehensive civil engineering design for this new 33kV substation compound at a disused site near Nottingham.
WCS are providing a fully comprehensive civil engineering design for this new 33kV substation compound at a disused site near Nottingham.
WCS is providing detailed civil engineering design and survey services for a new 11kV substation and associated cable route that’s required as part of the decommissioning of Wylfa Magnox nuclear power station in north Wales.
We have been appointed by Buckland Development Ltd to provide the civil engineering design for a new 132kV substation that will power this ambitious new Garden Village development on the south coast.
On this project for UK Power Networks Services (UKPNS) WCS provided on-site survey support and cable route design for new charging stations as part of a very welcome roll-out of electric vehicle (EV) infrastructure in the UK.
WCS were asked to provide both the temporary works design and to provide civils assurance for the permanent works design for Hitachi Energy at Padiham National Grid substation, Burnley.
As part of the off-shore wind farm connection from Dogger Bank to National Grid, WCS are supporting our clients, Hitachi Energy with the design of this new on-shore extension in Creyke Beck substation, Cottingham.
WCS are providing surveys and detailed civil engineering design for two 33kV cable circuits delivering power to the HS2 substation at Old Oak Common.
WCS has provided a complete civil & structural engineering design service for this new ticket hall and nearby ticket gate for Reading West station.
WCS has assisted with the undertaking of the ground investigation surveys and provided engineering design for new substation foundations and cable routes necessary for two critical elements of work at Trinity Terminal and Berths 8&9.
WCS have been brought on board by Linxon to provide consultation and civils design services during the construction phase of a new extension to an existing National Grid 400kV & 132kV substation in Bicker Fen, Boston.
Using 3D image scanning of the existing structure, WCS designed a new substation and cable route for the Electric Vehicle (EV) charging infrastructure at London’s Westbourne Park station for ESmart Networks.
GRIP 3 stage report, identifying key civils constraints and preliminary design for substations and cable routes for Northern Trains’ proposed replacement of diesel rolling stock with Battery Electric Multiple Units (BEMU).