PROJECT
Green Recovery
ABOUT THIS PROJECT
On this project for UK Power Networks Services (UKPNS) WCS provided detailed design for new charging stations as part of a very welcome roll-out of electric vehicle (EV) infrastructure in the UK.
WCS provided on-site surveys and civil engineering design for a series of connections from DNO substations. These will be developed later into charging points for cars and buses at three motorway service stations and six bus garages at 9 sites across London and the south-east.
Date: 2021 –
Client: UK Power Networks Services
