CP6 Kent and Sussex Earthing renewal
ABOUT THIS PROJECT
WCS have carried out the desktop studies and intrusive site surveys for our client UK Power Networks Services on the CP6 Design Services Framework (DSF) for Network Rail. The topographic, utilities and ground investigations carried out at thirteen sites, along with the Unexploded Ordnance Assessments and reporting allowed our client to complete the design of the earthing upgrades required at these substation sites.
Kim Kelly, Project Manager at UK Power Network Services gave positive feedback as follows:
Exceptional service from the team. Able and willing to assist and overcome obstacles encountered during site visits.
Date: Autumn 2020 – April 2021
Client: UK Power Networks Services