Powering HS2 in North London

Powering HS2 in North London

WCS are providing surveys and detailed civil engineering design for two 33kV cable circuits delivering power to the HS2 substation at Old Oak Common.

Surveys and Design for Network Rail and Greater Anglia

Surveys and Design for Network Rail and Greater Anglia

Working with Network Rail, main contractor J Murphy & Sons and Andromeda Engineering, WCS was asked to partner on a project to replace a number of Power Supply Points to the southern portion of the Great Eastern Line.

Northern Trains BEMU

Northern Trains BEMU

GRIP 3 stage report, identifying key civils constraints and preliminary design for substations and cable routes for Northern Trains’ proposed replacement of diesel rolling stock with Battery Electric Multiple Units (BEMU).

GRIP Feasibility Studies

GRIP Feasibility Studies

We produced technical and cost feasibility reports for increasing platform capacity across the southern and south-east regions to facilitate the upgrade to 12-car trains.

Reading Triangle Upper Sidings

Reading Triangle Upper Sidings

We provided surveys and dilapidation reports on the Amenity Block and Fuel Point Shed in order to catalogue their condition.