Aug 27, 2024
WCS provided design for Grip stages 4 & 5 for essential repairs to damaged elements of this brick arch rail bridge between Limehouse and Fenchurch Street for Amco Giffen, part of our client’s work for Network Rail under the Civil Asset Maintenance (CAM) Framework.
Aug 27, 2024
Significant defects were encountered at this rail overbridge in Shadwell, East London. WCS was called to site to carry out multiple inspections for our client and the Network Rail assessment team.
Aug 27, 2024
As part of our client’s Civil Asset Maintenance (CAM) – Anglia region framework for Network Rail, WCS were asked to attend site and provide a design solution to relieve pressure on a section of existing reinforced concrete retaining wall separating the track from private homeowners’ property.
Aug 27, 2024
WCS has provided a complete civil & structural engineering design service for this new ticket hall and nearby ticket gate for Reading West station.
Aug 27, 2024
We produced technical and cost feasibility reports for increasing platform capacity across the southern and south-east regions to facilitate the upgrade to 12-car trains.
Aug 27, 2024
We provided surveys and dilapidation reports on the Amenity Block and Fuel Point Shed in order to catalogue their condition.
Aug 27, 2024
Repairs and strengthening works were required to three footbridges at Goodmayes, Seven Kings and Brentwood stations for our client J. Murphy & Sons Limited as part of the CP6 framework.
Aug 27, 2024
As part of our Civil Asset Maintenance framework, WCS were called on New Year’s Day to inspect and assess accidental damage to the road bridge at Shoreditch High Street caused by excavations at street level.
Aug 27, 2024
A lorry strike at this rail underbridge in Wickford, Essex meant WCS were called to inspect and assess the level of damage and residual hazard caused by the collision.
Aug 27, 2024
WCS are providing a fully comprehensive civil engineering design for this new 33kV substation compound at a disused site near Nottingham.
Aug 27, 2024
WCS has assisted with the undertaking of the ground investigation surveys and provided engineering design for new substation foundations and cable routes necessary for two critical elements of work at Trinity Terminal and Berths 8&9.
Aug 27, 2024
WCS is providing detailed civil engineering design and survey services for a new 11kV substation and associated cable route that’s required as part of the decommissioning of Wylfa Magnox nuclear power station in north Wales.