Wylfa Nuclear Power Station

Wylfa Nuclear Power Station

WCS is providing detailed civil engineering design and survey services for a new 11kV substation and associated cable route that’s required as part of the decommissioning of Wylfa Magnox nuclear power station in north Wales.

Welborne Garden Village

Welborne Garden Village

We have been appointed by Buckland Development Ltd to provide the civil engineering design for a new 132kV substation that will power this ambitious new Garden Village development on the south coast.

Cody Technology Park

Cody Technology Park

WCS provided detailed design and checks on this challenging project for our client UK Power Networks Services at substation 46 & substation D at Cody Technology Park in Farnborough.

SELCHP (South-East London Combined Heat & Power) Ltd

SELCHP (South-East London Combined Heat & Power) Ltd

WCS has been supporting our client UK Power Networks Services (UKPNS) with detailed design for a new Private Wire Network and intake substation, required as part of an innovative scheme for Westminster City Council’s street cleansing and waste collection fleet in Lewisham.

Dudgeon & Sheringham Shoal – FEED Study

Dudgeon & Sheringham Shoal – FEED Study

WCS has produced a detailed Design Intent Document (DID) as part of our ongoing support to the Front-End Engineering Design (FEED) study by Hitachi Energy UK for the civils aspects of an onshore substation development near the existing 400kV National Grid substation at Norwich main.

Viking Link – Construction Stage Support

Viking Link – Construction Stage Support

WCS have been brought on board by Linxon to provide consultation and civils design services during the construction phase of a new extension to an existing National Grid 400kV & 132kV substation in Bicker Fen, Boston.

Hinkley Point C

Hinkley Point C

WCS provided permanent and temporary works design for the General Electric (GE) compound at one of Europe’s largest power projects for our client UK Power Networks Services.

Westbourne Park

Westbourne Park

Using 3D image scanning of the existing structure, WCS designed a new substation and cable route for the Electric Vehicle (EV) charging infrastructure at London’s Westbourne Park station for ESmart Networks.

Pimlico EV Charging

Pimlico EV Charging

WCS are very glad to be involved in the expansion of electric vehicle (EV) charging infrastructure with our clients, UK Power Networks Services (UKPNS).

Dogger Bank

Dogger Bank

As part of the off-shore wind farm connection from Dogger Bank to National Grid, WCS are supporting our clients, Hitachi Energy with the design of this new on-shore extension in Creyke Beck substation, Cottingham.