WCS out on site again on a crisp February morning, this time attending a survey under possession at Downs Park Road in Hackney with our client J Murphy & Sons (on behalf of Network Rail) and with OLE design support from Andromeda Engineering Limited.
The surveys for this newly awarded Control Period 6 structures framework project are for the GRIP 5 Civils Design of an overbridge full deck replacement. The project will require close interaction with several stakeholders including local education institutions, the construction teams, and utility owners.
As always, we are looking forward to working closely with our partners and client for the successful delivery of this much needed upgrade to the railway infrastructure.
#civilengineering #collaborate #renewal #overbridge #infrastructure #buildbackbetter