High Speed One Power Quality
Date: 2011 – 2012
Client: ABB/High Speed One
About this Project
Design co-ordination and management for the civil engineering sub-contractor on the High Speed One project in Kent. The objective was to install an annex to the existing railway and transformer compound to contain harmonic filter equipment for +/- 25kV AC system.
![highspeed](https://wcs-consult.co.uk/wp-content/webpc-passthru.php?src=http://wcs-consult.co.uk/wp-content/uploads/highspeed.jpg&nocache=1)