Midland Mainline

  • Date: 2021-2023

  • Client: SPL Powerlines

About this project

Working closely with our client SPL Powerlines and Network Rail this work is required to implement the detailed design of the upgrade needed to the existing OLE infrastructure and power system that will enable the operation of 6 additional Electric Powered trains per hour between St Pancras Station and Bedford stations.

 Providing survey and civil engineering design services for GRIP stages 4 and 5 on three packages of work so far, including for new substation compounds, road-rail access points (RRAPS) and pedestrian access points. WCS has also been able to provide electrical design through our supply chain relationships