Midland Mainline

Midland Mainline

WCS provided Grip stage 4 & 5 detailed design of the upgrade needed to the existing OLE infrastructure and power system that will enable the operation of 6 additional Electric Powered trains per hour between St Pancras Station and Bedford stations.

SELCHP (South-East London Combined Heat & Power) Ltd

SELCHP (South-East London Combined Heat & Power) Ltd

WCS has been supporting our client UK Power Networks Services (UKPNS) with detailed design for a new Private Wire Network and intake substation, required as part of an innovative scheme for Westminster City Council’s street cleansing and waste collection fleet in Lewisham.

Surveys and Design for Network Rail and Greater Anglia

Surveys and Design for Network Rail and Greater Anglia

Working with Network Rail, main contractor J Murphy & Sons and Andromeda Engineering, WCS was asked to partner on a project to replace a number of Power Supply Points to the southern portion of the Great Eastern Line.

East Anglia Footbridges

East Anglia Footbridges

Repairs and strengthening works were required to three footbridges at Goodmayes, Seven Kings and Brentwood stations for our client J. Murphy & Sons Limited as part of the CP6 framework.

Shoreditch Road Bridge

Shoreditch Road Bridge

As part of our Civil Asset Maintenance framework, WCS were called on New Year’s Day to inspect and assess accidental damage to the road bridge at Shoreditch High Street caused by excavations at street level.

Hawk Road Bridge

Hawk Road Bridge

A lorry strike at this rail underbridge in Wickford, Essex meant WCS were called to inspect and assess the level of damage and residual hazard caused by the collision.

Willesden Overbridge

Willesden Overbridge

Urgent works were required for our client, J. Murphy & Sons Ltd. as part of their Civil Asset Maintenance contract with Network Rail on this overbridge in Willesden.

Cody Technology Park

Cody Technology Park

WCS provided detailed design and checks on this challenging project for our client UK Power Networks Services at substation 46 & substation D at Cody Technology Park in Farnborough.

Hinkley Point C

Hinkley Point C

WCS provided permanent and temporary works design for the General Electric (GE) compound at one of Europe’s largest power projects for our client UK Power Networks Services.

Lineside Switching Platforms

Lineside Switching Platforms

WCS have carried out the survey and design of 70 lineside switching platforms across the Greater West programme of works.