Ilkeston 33kV Substation
WCS are providing a fully comprehensive civil engineering design for this new 33kV substation compound at a disused site near Nottingham.
WCS are providing a fully comprehensive civil engineering design for this new 33kV substation compound at a disused site near Nottingham.
WCS is providing detailed civil engineering design and survey services for a new 11kV substation and associated cable route that’s required as part of the decommissioning of Wylfa Magnox nuclear power station in north Wales.
We have been appointed by Buckland Development Ltd to provide the civil engineering design for a new 132kV substation that will power this ambitious new Garden Village development on the south coast.
On this project for UK Power Networks Services (UKPNS) WCS provided on-site survey support and cable route design for new charging stations as part of a very welcome roll-out of electric vehicle (EV) infrastructure in the UK.
As part of the off-shore wind farm connection from Dogger Bank to National Grid, WCS are supporting our clients, Hitachi Energy with the design of this new on-shore extension in Creyke Beck substation, Cottingham.
WCS are providing surveys and detailed civil engineering design for two 33kV cable circuits delivering power to the HS2 substation at Old Oak Common.
WCS has provided a complete civil & structural engineering design service for this new ticket hall and nearby ticket gate for Reading West station.
WCS has assisted with the undertaking of the ground investigation surveys and provided engineering design for new substation foundations and cable routes necessary for two critical elements of work at Trinity Terminal and Berths 8&9.
Using 3D image scanning of the existing structure, WCS designed a new substation and cable route for the Electric Vehicle (EV) charging infrastructure at London’s Westbourne Park station for ESmart Networks.
Significant defects were encountered at this rail overbridge in Shadwell, East London. WCS was called to site to carry out multiple inspections for our client and the Network Rail assessment team.
WCS provided Grip stage 4 & 5 detailed design of the upgrade needed to the existing OLE infrastructure and power system that will enable the operation of 6 additional Electric Powered trains per hour between St Pancras Station and Bedford stations.
WCS has been supporting our client UK Power Networks Services (UKPNS) with detailed design for a new Private Wire Network and intake substation, required as part of an innovative scheme for Westminster City Council’s street cleansing and waste collection fleet in Lewisham.