Intercity Express Programme Doncaster Depot Power Upgrade
A power upgrade for a crucial train maintenance depot in Doncaster.
A power upgrade for a crucial train maintenance depot in Doncaster.
Instrusive surveys and desktop studies on CP6 Design Services Framework.
Working with Network Rail, main contractor J Murphy & Sons and Andromeda Engineering, WCS was asked to partner on a project to replace a number of Power Supply Points to the southern portion of the Great Eastern Line.
WCS provided Grip stage 4 & 5 detailed design of the upgrade needed to the existing OLE infrastructure and power system that will enable the operation of 6 additional Electric Powered trains per hour between St Pancras Station and Bedford stations.
Repairs and strengthening works were required to three footbridges at Goodmayes, Seven Kings and Brentwood stations for our client J. Murphy & Sons Limited as part of the CP6 framework.
WCS has provided a complete civil & structural engineering design service for this new ticket hall and nearby ticket gate for Reading West station.
WCS is providing detailed civil engineering design and survey services for a new 11kV substation and associated cable route that’s required as part of the decommissioning of Wylfa Magnox nuclear power station in north Wales.