Morris Street Bridge Strengthening

Morris Street Bridge Strengthening

Significant defects were encountered at this rail overbridge in Shadwell, East London. WCS was called to site to carry out multiple inspections for our client and the Network Rail assessment team.

Dudgeon & Sheringham Shoal – FEED Study

Dudgeon & Sheringham Shoal – FEED Study

WCS has produced a detailed Design Intent Document (DID) as part of our ongoing support to the Front-End Engineering Design (FEED) study by Hitachi Energy UK for the civils aspects of an onshore substation development near the existing 400kV National Grid substation at Norwich main.

Midland Mainline

Midland Mainline

WCS provided Grip stage 4 & 5 detailed design of the upgrade needed to the existing OLE infrastructure and power system that will enable the operation of 6 additional Electric Powered trains per hour between St Pancras Station and Bedford stations.

SELCHP (South-East London Combined Heat & Power) Ltd

SELCHP (South-East London Combined Heat & Power) Ltd

WCS has been supporting our client UK Power Networks Services (UKPNS) with detailed design for a new Private Wire Network and intake substation, required as part of an innovative scheme for Westminster City Council’s street cleansing and waste collection fleet in Lewisham.

Surveys and Design for Network Rail and Greater Anglia

Surveys and Design for Network Rail and Greater Anglia

Working with Network Rail, main contractor J Murphy & Sons and Andromeda Engineering, WCS was asked to partner on a project to replace a number of Power Supply Points to the southern portion of the Great Eastern Line.

East Anglia Footbridges

East Anglia Footbridges

Repairs and strengthening works were required to three footbridges at Goodmayes, Seven Kings and Brentwood stations for our client J. Murphy & Sons Limited as part of the CP6 framework.

Willesden Overbridge

Willesden Overbridge

Urgent works were required for our client, J. Murphy & Sons Ltd. as part of their Civil Asset Maintenance contract with Network Rail on this overbridge in Willesden.

Cody Technology Park

Cody Technology Park

WCS provided detailed design and checks on this challenging project for our client UK Power Networks Services at substation 46 & substation D at Cody Technology Park in Farnborough.

Pimlico EV Charging

Pimlico EV Charging

WCS are very glad to be involved in the expansion of electric vehicle (EV) charging infrastructure with our clients, UK Power Networks Services (UKPNS).

Hinkley Point C

Hinkley Point C

WCS provided permanent and temporary works design for the General Electric (GE) compound at one of Europe’s largest power projects for our client UK Power Networks Services.

Lineside Switching Platforms

Lineside Switching Platforms

WCS have carried out the survey and design of 70 lineside switching platforms across the Greater West programme of works.