Great Western Electrification Programme
Provision of design and checking services on the biggest UK electrification project of the last decade.
Provision of design and checking services on the biggest UK electrification project of the last decade.
The detailed design of approximately 10km of cable route including 22kV feeders and associated fibre route.
A power upgrade for a crucial train maintenance depot in Doncaster.
WCS have carried out the survey and design of 70 lineside switching platforms across the Greater West programme of works.
A New Bulk Supply Point and associated 52km of HV cable route for the LU power upgrade.
Repairs and strengthening works were required to three footbridges at Goodmayes, Seven Kings and Brentwood stations for our client J. Murphy & Sons Limited as part of the CP6 framework.
As part of our Civil Asset Maintenance framework, WCS were called on New Year’s Day to inspect and assess accidental damage to the road bridge at Shoreditch High Street caused by excavations at street level.
A lorry strike at this rail underbridge in Wickford, Essex meant WCS were called to inspect and assess the level of damage and residual hazard caused by the collision.
WCS provided design for Grip stages 4 & 5 for essential repairs to damaged elements of this brick arch rail bridge between Limehouse and Fenchurch Street for Amco Giffen, part of our client’s work for Network Rail under the Civil Asset Maintenance (CAM) Framework.
Significant defects were encountered at this rail overbridge in Shadwell, East London. WCS was called to site to carry out multiple inspections for our client and the Network Rail assessment team.
WCS has provided a complete civil & structural engineering design service for this new ticket hall and nearby ticket gate for Reading West station.
WCS are providing a fully comprehensive civil engineering design for this new 33kV substation compound at a disused site near Nottingham.