Lineside Switching Platforms

Lineside Switching Platforms

WCS have carried out the survey and design of 70 lineside switching platforms across the Greater West programme of works.

East Anglia Footbridges

East Anglia Footbridges

Repairs and strengthening works were required to three footbridges at Goodmayes, Seven Kings and Brentwood stations for our client J. Murphy & Sons Limited as part of the CP6 framework.

Shoreditch Road Bridge

Shoreditch Road Bridge

As part of our Civil Asset Maintenance framework, WCS were called on New Year’s Day to inspect and assess accidental damage to the road bridge at Shoreditch High Street caused by excavations at street level.

Hawk Road Bridge

Hawk Road Bridge

A lorry strike at this rail underbridge in Wickford, Essex meant WCS were called to inspect and assess the level of damage and residual hazard caused by the collision.

Crutched Friars Underbridge

Crutched Friars Underbridge

WCS provided design for Grip stages 4 & 5 for essential repairs to damaged elements of this brick arch rail bridge between Limehouse and Fenchurch Street for Amco Giffen, part of our client’s work for Network Rail under the Civil Asset Maintenance (CAM) Framework.

Morris Street Bridge Strengthening

Morris Street Bridge Strengthening

Significant defects were encountered at this rail overbridge in Shadwell, East London. WCS was called to site to carry out multiple inspections for our client and the Network Rail assessment team.

Reading West Station

Reading West Station

WCS has provided a complete civil & structural engineering design service for this new ticket hall and nearby ticket gate for Reading West station.

Ilkeston 33kV Substation

Ilkeston 33kV Substation

WCS are providing a fully comprehensive civil engineering design for this new 33kV substation compound at a disused site near Nottingham.