Aug 27, 2024
WCS has produced a detailed Design Intent Document (DID) as part of our ongoing support to the Front-End Engineering Design (FEED) study by Hitachi Energy UK for the civils aspects of an onshore substation development near the existing 400kV National Grid substation at Norwich main.
Aug 27, 2024
WCS has been supporting our client UK Power Networks Services (UKPNS) with detailed design for a new Private Wire Network and intake substation, required as part of an innovative scheme for Westminster City Council’s street cleansing and waste collection fleet in Lewisham.
Aug 27, 2024
Repairs and strengthening works were required to three footbridges at Goodmayes, Seven Kings and Brentwood stations for our client J. Murphy & Sons Limited as part of the CP6 framework.
Aug 27, 2024
WCS provided detailed design and checks on this challenging project for our client UK Power Networks Services at substation 46 & substation D at Cody Technology Park in Farnborough.
Aug 27, 2024
WCS are very glad to be involved in the expansion of electric vehicle (EV) charging infrastructure with our clients, UK Power Networks Services (UKPNS).
Aug 27, 2024
WCS provided permanent and temporary works design for the General Electric (GE) compound at one of Europe’s largest power projects for our client UK Power Networks Services.
Aug 27, 2024
WCS have carried out the survey and design of 70 lineside switching platforms across the Greater West programme of works.
Aug 27, 2024
A power upgrade for a crucial train maintenance depot in Doncaster.
Aug 27, 2024
Provision of design and checking services on the biggest UK electrification project of the last decade.
Aug 27, 2024
The detailed design of approximately 10km of cable route including 22kV feeders and associated fibre route.
Aug 27, 2024
A New Bulk Supply Point and associated 52km of HV cable route for the LU power upgrade.