Dudgeon & Sheringham Shoal – FEED Study

Dudgeon & Sheringham Shoal – FEED Study

WCS has produced a detailed Design Intent Document (DID) as part of our ongoing support to the Front-End Engineering Design (FEED) study by Hitachi Energy UK for the civils aspects of an onshore substation development near the existing 400kV National Grid substation at Norwich main.

SELCHP (South-East London Combined Heat & Power) Ltd

SELCHP (South-East London Combined Heat & Power) Ltd

WCS has been supporting our client UK Power Networks Services (UKPNS) with detailed design for a new Private Wire Network and intake substation, required as part of an innovative scheme for Westminster City Council’s street cleansing and waste collection fleet in Lewisham.

East Anglia Footbridges

East Anglia Footbridges

Repairs and strengthening works were required to three footbridges at Goodmayes, Seven Kings and Brentwood stations for our client J. Murphy & Sons Limited as part of the CP6 framework.

Cody Technology Park

Cody Technology Park

WCS provided detailed design and checks on this challenging project for our client UK Power Networks Services at substation 46 & substation D at Cody Technology Park in Farnborough.

Pimlico EV Charging

Pimlico EV Charging

WCS are very glad to be involved in the expansion of electric vehicle (EV) charging infrastructure with our clients, UK Power Networks Services (UKPNS).

Hinkley Point C

Hinkley Point C

WCS provided permanent and temporary works design for the General Electric (GE) compound at one of Europe’s largest power projects for our client UK Power Networks Services.

Lineside Switching Platforms

Lineside Switching Platforms

WCS have carried out the survey and design of 70 lineside switching platforms across the Greater West programme of works.