Working with Network Rail, main contractor J Murphy & Sons and Andromeda Engineering, WCS was asked to partner on a project to replace a number of Power Supply Points to the southern portion of the Great Eastern Line.
Aug 27, 2024
WCS provided Grip stage 4 & 5 detailed design of the upgrade needed to the existing OLE infrastructure and power system that will enable the operation of 6 additional Electric Powered trains per hour between St Pancras Station and Bedford stations.
Aug 27, 2024
WCS are providing surveys and detailed civil engineering design for two 33kV cable circuits delivering power to the HS2 substation at Old Oak Common.
Aug 27, 2024
A New Bulk Supply Point and associated 52km of HV cable route for the LU power upgrade.
Aug 27, 2024
Provision of design and checking services on the biggest UK electrification project of the last decade.
Aug 27, 2024
The detailed design of approximately 10km of cable route including 22kV feeders and associated fibre route.
Aug 27, 2024
A power upgrade for a crucial train maintenance depot in Doncaster.
Aug 27, 2024
WCS have carried out the survey and design of 70 lineside switching platforms across the Greater West programme of works.
Aug 27, 2024
Repairs and strengthening works were required to three footbridges at Goodmayes, Seven Kings and Brentwood stations for our client J. Murphy & Sons Limited as part of the CP6 framework.
Aug 27, 2024
As part of our client’s Civil Asset Maintenance (CAM) – Anglia region framework for Network Rail, WCS were asked to attend site and provide a design solution to relieve pressure on a section of existing reinforced concrete retaining wall separating the track from private homeowners’ property.
Aug 27, 2024
WCS has provided a complete civil & structural engineering design service for this new ticket hall and nearby ticket gate for Reading West station.
Aug 27, 2024
WCS are providing a fully comprehensive civil engineering design for this new 33kV substation compound at a disused site near Nottingham.