Reading Triangle Upper Sidings
We provided surveys and dilapidation reports on the Amenity Block and Fuel Point Shed in order to catalogue their condition.
We provided surveys and dilapidation reports on the Amenity Block and Fuel Point Shed in order to catalogue their condition.
We produced technical and cost feasibility reports for increasing platform capacity across the southern and south-east regions to facilitate the upgrade to 12-car trains.
WCS are providing surveys and detailed civil engineering design for two 33kV cable circuits delivering power to the HS2 substation at Old Oak Common.
GRIP 3 stage report, identifying key civils constraints and preliminary design for substations and cable routes for Northern Trains’ proposed replacement of diesel rolling stock with Battery Electric Multiple Units (BEMU).
Working with Network Rail, main contractor J Murphy & Sons and Andromeda Engineering, WCS was asked to partner on a project to replace a number of Power Supply Points to the southern portion of the Great Eastern Line.
Provision of design and checking services on the biggest UK electrification project of the last decade.