Powering HS2 in North London

Powering HS2 in North London

WCS are providing surveys and detailed civil engineering design for two 33kV cable circuits delivering power to the HS2 substation at Old Oak Common.

Reading West Station

Reading West Station

WCS has provided a complete civil & structural engineering design service for this new ticket hall and nearby ticket gate for Reading West station.

Port of Felixstowe

Port of Felixstowe

WCS has assisted with the undertaking of the ground investigation surveys and provided engineering design for new substation foundations and cable routes necessary for two critical elements of work at Trinity Terminal and Berths 8&9.

Wylfa Nuclear Power Station

Wylfa Nuclear Power Station

WCS is providing detailed civil engineering design and survey services for a new 11kV substation and associated cable route that’s required as part of the decommissioning of Wylfa Magnox nuclear power station in north Wales.

Welborne Garden Village

Welborne Garden Village

We have been appointed by Buckland Development Ltd to provide the civil engineering design for a new 132kV substation that will power this ambitious new Garden Village development on the south coast.

Cody Technology Park

Cody Technology Park

WCS provided detailed design and checks on this challenging project for our client UK Power Networks Services at substation 46 & substation D at Cody Technology Park in Farnborough.

SELCHP (South-East London Combined Heat & Power) Ltd

SELCHP (South-East London Combined Heat & Power) Ltd

WCS has been supporting our client UK Power Networks Services (UKPNS) with detailed design for a new Private Wire Network and intake substation, required as part of an innovative scheme for Westminster City Council’s street cleansing and waste collection fleet in Lewisham.

Viking Link – Construction Stage Support

Viking Link – Construction Stage Support

WCS have been brought on board by Linxon to provide consultation and civils design services during the construction phase of a new extension to an existing National Grid 400kV & 132kV substation in Bicker Fen, Boston.

Hinkley Point C

Hinkley Point C

WCS provided permanent and temporary works design for the General Electric (GE) compound at one of Europe’s largest power projects for our client UK Power Networks Services.

Westbourne Park

Westbourne Park

Using 3D image scanning of the existing structure, WCS designed a new substation and cable route for the Electric Vehicle (EV) charging infrastructure at London’s Westbourne Park station for ESmart Networks.

Green Recovery

Green Recovery

On this project for UK Power Networks Services (UKPNS) WCS provided on-site survey support and cable route design for new charging stations as part of a very welcome roll-out of electric vehicle (EV) infrastructure in the UK.