Surveys and Design for Network Rail and Greater Anglia

Surveys and Design for Network Rail and Greater Anglia

Working with Network Rail, main contractor J Murphy & Sons and Andromeda Engineering, WCS was asked to partner on a project to replace a number of Power Supply Points to the southern portion of the Great Eastern Line.

Midland Mainline

Midland Mainline

WCS provided Grip stage 4 & 5 detailed design of the upgrade needed to the existing OLE infrastructure and power system that will enable the operation of 6 additional Electric Powered trains per hour between St Pancras Station and Bedford stations.

Northern Trains BEMU

Northern Trains BEMU

GRIP 3 stage report, identifying key civils constraints and preliminary design for substations and cable routes for Northern Trains’ proposed replacement of diesel rolling stock with Battery Electric Multiple Units (BEMU).

Powering HS2 in North London

Powering HS2 in North London

WCS are providing surveys and detailed civil engineering design for two 33kV cable circuits delivering power to the HS2 substation at Old Oak Common.

High Speed One Power Quality

High Speed One Power Quality

Design co-ordination and management for the civil engineering sub-contractor on the High Speed One project in Kent.

Lineside Switching Platforms

Lineside Switching Platforms

WCS have carried out the survey and design of 70 lineside switching platforms across the Greater West programme of works.

Crutched Friars Underbridge

Crutched Friars Underbridge

WCS provided design for Grip stages 4 & 5 for essential repairs to damaged elements of this brick arch rail bridge between Limehouse and Fenchurch Street for Amco Giffen, part of our client’s work for Network Rail under the Civil Asset Maintenance (CAM) Framework.