London Underground Power Upgrade
The detailed design of approximately 10km of cable route including 22kV feeders and associated fibre route.
The detailed design of approximately 10km of cable route including 22kV feeders and associated fibre route.
A power upgrade for a crucial train maintenance depot in Doncaster.
WCS have carried out the survey and design of 70 lineside switching platforms across the Greater West programme of works.
Working with Network Rail, main contractor J Murphy & Sons and Andromeda Engineering, WCS was asked to partner on a project to replace a number of Power Supply Points to the southern portion of the Great Eastern Line.
WCS provided Grip stage 4 & 5 detailed design of the upgrade needed to the existing OLE infrastructure and power system that will enable the operation of 6 additional Electric Powered trains per hour between St Pancras Station and Bedford stations.
WCS are providing surveys and detailed civil engineering design for two 33kV cable circuits delivering power to the HS2 substation at Old Oak Common.
A New Bulk Supply Point and associated 52km of HV cable route for the LU power upgrade.
Provision of design and checking services on the biggest UK electrification project of the last decade.
Repairs and strengthening works were required to three footbridges at Goodmayes, Seven Kings and Brentwood stations for our client J. Murphy & Sons Limited as part of the CP6 framework.
As part of our client’s Civil Asset Maintenance (CAM) – Anglia region framework for Network Rail, WCS were asked to attend site and provide a design solution to relieve pressure on a section of existing reinforced concrete retaining wall separating the track from private homeowners’ property.
WCS has provided a complete civil & structural engineering design service for this new ticket hall and nearby ticket gate for Reading West station.
WCS are providing a fully comprehensive civil engineering design for this new 33kV substation compound at a disused site near Nottingham.