Nov 25, 2026 | Energy & Power
Located approximately 120 km off the Norfolk coast, Ørsted’s Hornsea 3 is set to become the world’s largest single offshore wind farm upon completion in 2027. The £8.5 billion development will have a generating capacity of 2.9 GW, enough to power more than...
Nov 20, 2026 | Energy & Power
The UK government’s Clean Power 2030 plan is driving a rapid expansion of renewable generation, with battery energy storage systems (BESS) and solar colocation becoming key tools in enabling resilient grid connections. Delivering these sites means managing a complex...
Nov 20, 2026 | Energy & Power
Battery energy storage projects require civil and structural design that can resolve multiple technical and programme constraints in parallel. At Mauxhall Farm – a 25MW Battery Energy Storage System (BESS) development – the principal considerations included tidal...
Oct 29, 2026 | Energy & Power
The London Power Tunnels 2 (LPT2) project represents a major upgrade to the city’s underground electricity network. Designed to replace older power routes beneath London roads, the scheme will reduce maintenance disruptions and accommodate rising energy demand. It...
Sep 7, 2026 | Energy & Power, Sustainability
Whitfield Consulting Services (WCS) has Contractor Design Approval Engineer (CDAE) capability across its team, including Managing Director Asa Whitfield and Directors Dr Natalja Petkune and Nick Lowe. A CDAE is a senior, authorised...
Sep 2, 2026 | Energy & Power, Sustainability
The recurring civil engineering challenges on distribution and transmission infrastructure projects are familiar: incomplete early-stage information, constrained operational sites, cable routing, buried services, equipment access, temporary...
Aug 17, 2026 | Energy & Power, Sustainability
Whitfield Consulting Services (WCS) is providing detailed civil engineering design to UK Power Networks Services (UKPNS) under Ofgem’s RIIO-ED2 framework, a regulatory framework which runs from 2023 to 2028, focused on...
Jul 14, 2026 | Case Study, Energy & Power
Whitfield Consulting Services (WCS) supports transmission and distribution network operators, framework delivery partners, independent connection providers (ICPs) and contractors across the UK and Ireland. From National Grid’s London Power...
Jun 17, 2026 | Case Study, Energy & Power
Flooding events are increasing in frequency and intensity across the UK, placing unprecedented stress on critical energy infrastructure. Bridges and access routes that support high‑voltage substations are particularly vulnerable: loss of access often means...
Mar 30, 2026 | Case Study, Energy & Power
WCS is proud to be supporting the extension of Eccles Substation – a project that will become the UK’s first site to combine both static and synchronous compensation equipment. Once operational, the substation will enable up to 280 megawatts of...
Feb 11, 2026 | Case Study, Energy & Power, Rail: Civils & Structures
The success of infrastructure projects requires temporary works to be considered front and centre of the design process. These engineering structures – essential during construction but absent from the final structure – ensure permanent works can be built safely,...
Oct 13, 2025 | Energy & Power
Whether building new substations, or deploying large-scale battery storage, the early stages of project design can go a long way to ensuring successful delivery. Front-end design is where early-stage assumptions about a site and its constraints are investigated in...